Projects – DCE Structural & Civil Engineers http://www.dcengineers.com.au The Engineer of Choice Sun, 29 May 2022 05:55:03 +0000 en-AU hourly 1 https://wordpress.org/?v=5.1.19 http://www.dcengineers.com.au/wp-content/uploads/2019/04/cropped-DCE-Solo-Logo-2-1-32x32.jpg Projects – DCE Structural & Civil Engineers http://www.dcengineers.com.au 32 32 Project 1: Heavy Vehicle Workshop, Warren NSW. http://www.dcengineers.com.au/?p=800 Wed, 03 Apr 2019 10:05:21 +0000 http://www.dcengineers.com.au/?p=800

Role

>Structural & Civil Engineer

>Construction Inspections & Final Certificate

Details

>1,650 m2 total floor area

>Site rehabilitation, earthworks, base preparation

>Bored piers, floating slab, inspection pit design

>Structural steel portal frame design using ILB members

]]>
Project 2: Swane’s Truck Centre, Dubbo NSW. http://www.dcengineers.com.au/?p=798 Wed, 03 Apr 2019 10:04:40 +0000 http://www.dcengineers.com.au/?p=798

Role

>Structural, Civil & Hydraulic Engineer

>Construction Inspections & Final Certificate

Details

>1,205 m2 total floor area

>Base preparation, bored piers, floating slab, inspection pit design, structural steel portal frame design

>Tilt panels to trade waste area

>Architectural, earthworks, stormwater, detention basin, pavement design & fire service design

]]>
Project 3: Bultje Street Medical Centre, Dubbo NSW. http://www.dcengineers.com.au/?p=796 Wed, 03 Apr 2019 10:04:04 +0000 http://www.dcengineers.com.au/?p=796

Role

>Structural Engineer

>Construction Inspections & Final Certificate

Details

>940 m2 total floor area

>Site remediation, base preparation, raft slab & bearing pier design

>Structural steel design

>Tilt panel walls, Bondek suspended slab, reinforced block lift structure

]]>
Project 4: Ambulance Station & Workshop, Dubbo NSW. http://www.dcengineers.com.au/?p=793 Wed, 03 Apr 2019 10:03:02 +0000 http://www.dcengineers.com.au/?p=793

Role

>Structural, Civil & Hydraulic Engineer

>Construction Inspections & Final Certificate

Details

>570 m2 floor area workshop / 320 m2 floor area office 

>Base preparation, bored piers, floating slab, structural steel portal frames, tilt panel walls to workshop

>Base preparation, raft slab design, light steel framing to office

>Earthworks, stormwater, sewerage & pavement design

]]>
Project 5: Warrumbungle Council Chambers, Coonabarabran NSW. http://www.dcengineers.com.au/?p=789 Wed, 03 Apr 2019 10:01:02 +0000 http://www.dcengineers.com.au/?p=789

Role

>Structural Engineer

>Construction Inspections & Final Certificate

Details

>1,500 m2 total floor area

>Site remediation, ground preparation, raft slab-on-ground & Bondek suspended slab

>Structural steel frame design

>AFS Logic walls, block wall lift structure, cantilevered street awnings

]]>
Project 6: Tritton Mine Offices, Amenities & Workshop, Hermidale NSW. http://www.dcengineers.com.au/?p=787 Wed, 03 Apr 2019 10:00:32 +0000 http://www.dcengineers.com.au/?p=787

Role

>Structural, Civil & Hydraulics Engineer

>Contract Administration, Project Manager & Construction Supervision

>Construction Inspections & Final Certificate

Details

>Earthworks, base preparation, bored piers, floating slab, inspection pit design for workshop

>Structural steel portal frame design for workshop

>Architectural design & footings for offices and amenities

>Water reticulation, stormwater, septic tank, wash down bay and bog-out pit design

]]>
Project 7: St. Laurence’s Primary School Hall, Dubbo NSW. http://www.dcengineers.com.au/?p=785 Wed, 03 Apr 2019 10:00:03 +0000 http://www.dcengineers.com.au/?p=785

Role

>Structural & Civil Engineer

>Construction Inspections & Final Certificate

Details

>435 m2 total floor area

>Earthworks, base preparation, raft slab-on-ground

>Structural steel framing design

>Block walls, Ritek roof panelling

]]>
Project 8: Western Plains Automotive Mercedes, Dubbo NSW. http://www.dcengineers.com.au/?p=741 Wed, 03 Apr 2019 03:34:28 +0000 http://www.dcengineers.com.au/?p=741

Role

>Structural, Civil & Hydraulics Engineer

>Construction Inspections & Final Certificate

Details

>450 m2 total floor area

>Earthworks, base preparation, raft slab-on-ground, bearing piers, reinforced block walls

>Structural steel design, ILB members for clear flat spans, steel framed mezzanine / office level

>Stormwater & fire service design

]]>
Project 9: Western Plains Automotive Used Sales, Dubbo NSW. http://www.dcengineers.com.au/?p=731 Wed, 03 Apr 2019 02:58:57 +0000 http://www.dcengineers.com.au/?p=731

Role

>Structural & Civil Engineer

>Construction Inspections & Final Certificate

Details

>505 m2 total floor area

>Earthworks, base preparation, raft slab-on-ground, bearing piers, reinforced block retaining walls

>Structural steel portal frame design, ILB members for clear flat spans

>Tilt panels to workshop

>Stormwater & pavement design

]]>
Project 10: Cantilevered Public Shelters, Dubbo & Orange NSW. http://www.dcengineers.com.au/?p=725 Tue, 02 Apr 2019 23:35:39 +0000 http://www.dcengineers.com.au/?p=725

Role

>Structural Engineer

Details

>Cantilevered spans ranging from 1.5 m to 5.4 m

>Bored pier design

>Structural steel design

>Snow loading conditions (Orange)

]]>